On the safety of the work of major hazard arrangements (the provincial inspection team to visit the guide)

Monthly security regular meeting.
First, the general manager (Ni Yanyi): on August 29 provincial inspection team to visit our company. On the safety of our company conducted a large investigation, the investigation results hidden many, my company quickly acted up, organized on-site self-examination, immediately rectification, to eliminate hidden dangers, the real implementation of the safety management measures, constitute a major hazard source Department - ammonia machine workshop carried out by the security personnel to implement the special rectification. The self-examination project and the rectification report are as follows.
Second, the integrated management minister (Liu Hai reef): on the safety conference rectification work, our company need to do the following work:
1, the fire truck channel stack a lot of debris serious blockage of fire engines;
2, evacuation channel and plant to build color steel building, fire risk
3, ammonia engine room on duty during the period to play mobile phone
4, the unit fire safety self-training system is not implemented, the safety management personnel business capacity is not high, fire facilities, equipment operation unskilled.
5, the unit of fire facilities, equipment, daily maintenance is not in place, ammonia room liquid ammonia spray system part of the nozzle block can not be used normally, fire water pressure is insufficient, when the water outlet interface burst, the configuration of the gas mask aging serious.
IV. Assistant Secretary for Integrated Management (Fang Songkang):
 Rectification results are as follows: 1, a large number of debris removed, the fire channel flow.
2, A, evacuation channel debris removal. B, on the color plate, the person in charge has been instructed, all rectification, contact the engineering team, on September 1 tomorrow to start work. Rectification deadline: 15 days. On 2016.96, the rectification was completed.
3, the company notice, the end of the assessment, cancellation of evaluation, advanced, qualifying.
4, A, fire safety training units have implemented this year, the scene is also implemented in the exercise, but the staff inculcation failed to reflect the need to strengthen learning. B, safety management personnel need to train to improve management capacity. Has been reported to the training list. C, fire facilities have been implemented, equipment operation from time to time operation, enhance proficiency.
5, A, fire facilities, equipment has been all new, has been implemented. In accordance with the ammonia room management rules 17, do a good job of fire safety. B, ammonia machine sprinkler replacement has been implemented. C, fire hose replacement has been implemented. D, gas mask replacement has been implemented.
Fourth, general manager (Ni Yanyi):
Summary: During the summit, hope that the G20 summit in the grim situation, the departments must be responsible for departmental safety responsibilities. Set up safety production management agencies, under the security section, responsible for security work to carry out the audit. Responsible for the implementation of the safety of production leading group deployment work carried out. To ensure that the company no hidden accidents, the security as a top priority.

ABOUT US CULTURE CORP STYLE SALES CENTER CONTACT US
Add:6 Zhejiang city of Zhoushan province Putuo District Zhan Mao Street Toshima Industrial Park area A
Pos:316000
Tel:0580-6201829
Fax:0580-6368893
Copyright © 2002-2014 Zhejiang Rongzhou Marine industry Limited by Share Ltd. All Rights Reserved. 浙ICP备16046361号 Technical support:93Baidu.com
XML 地图